Built-in box
- When building the opening should have a 100mm lip on either side for the box to rest on.
- If the client requests counter sunk channels, the entry of the box must be moved to the back ( inside the building ) Back entry.
- For a bottom entry the channels will be surface mounted on the sides of the opening infront
